Prime Projects

The project comprised the upgrading of Road P127/2, starting from the N4 at km 4.4 and ending at km 25.52 on road D914 (Bethal, Van Dyks Drift road). The road is part of the link road between Duvha power station and various coalmines and therefore trafficked extensively with heavy vehicles.

The upgrading involved the following:
• The construction of an in-situ recycled sub base (4,2km @ 150mm depth and 16,3km @ 300mm depth)
• Construction of 150mm crushed stone base with 50mm Asphalt.
• The construction of a 2.7m surfaced shoulder on either side.
• Upgrading the Duvha Intersection with slip lanes.
• Construction of a climbing lane (length: 860m).
• Ancillary road works to including kerbing, lengthening of culverts and reconstruction of storm water culvert inlet and outlet structures.
• Painting of new road markings and erection of new road signage.

Additional Info

  • Province Mpumalanga
  • Project Date 2015
  • Project Value R 28 000 000
  • Client Name Mpumalanga Provincial Government - Department of Roads and Transport

This project entails the refurbishment and strengthening of the Old Crocodile River Bridge.  The bridge comprises two 20m plate girder end spans and two 32m steel truss main spans. The total length of the bridge is 104m.  The riding surface kerb to kerb width is 4.94 m. The assessment of the bridge showed that the structure cannot withstand adequate loadings as per the South African design code TMH 7 parts 1 and 2.  However, once rehabilitated as required by this contract the structure will be able to carry the NB24 loading.

 

Localised damaged steel sections (damaged due to corrosion) was replaced or repaired and eight steel struts on the main spans was strengthen. The existing bridge profile consisted of asphaltic surface over granular pavement layer on top of continuous steel troughs. The existing surfacing and all pavement layers on the bridge deck was removed and replaced with reinforced concrete and shear stud connectors forming a composite deck-slab system. Walkways were constructed on both sides to accommodate pedestrian movement and the 3.6m carriageway was surfaced with 40mm medium continuous grade asphalt.  Five proprietary expansion joints were installed to accommodate movement of decks. All steel elements were grit blasting and a corrosion protection system applied. 

The Lydenburg outfall sewer consist of the introduction of a new outfall sewer for the proposed future developments in Lydenburg. The expected high rate of residential development earmarked for Lydenburg in the near future has resulted in the urgent upgrading of all water and sanitation infrastructure in order to accommodate any future development.  The Lydenburg outfall sewer include the following infrastructure:

Additional Info

  • Province Mpumalanga
  • City or Town Thaba Chweu
  • Project Date 2008 to 2009
  • Project Value R 19 000 000
  • Client Name Mpumalanga Housing Finance Corporation

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date 2007 to 2010
  • Project Value R 500 000 000
  • Client Name Ilanga Lifestyle (Pty) Ltd

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date 2008 to 2009
  • Project Value R 10 000 000
  • Client Name Private Developer

Additional Info

  • Province Mpumalanga
  • City or Town White River
  • Project Date 2008 to 2009
  • Project Value R 26 000 000
  • Client Name NTT Motors 384 (Pty) Ltd

The building has of two underground basement parking levels with five floors of offices above. The total floor space provided is 10 300m².
Soil-nailing was used in the construction of the basement where the excavation was ±8m deep with adjacent buildings in close proximity. The system consists of drilling holes downwards at 10 degrees to the horizontal into the ground, installing steel rods into the holes and encasing the rods with grout. The face of the excavation is covered with gunite (shotcrete) – reinforcement is placed within the gunite layer. Construction, including excavation, proceeds from the top of ground level downwards in stages of 1 to 2m.

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date 2008 to 2009
  • Project Value R 50 000 000
  • Client Name Private Developer

The EDM office complex comprises of 3 office buildings and a Disaster Management/ Conference Centre. The four buildings are each a minimum of three storey's high.  The total floor space provided is 15 038m². Three construction contracts were awarded i.e. bulk earthworks, piling and building.

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date 2009 to 2010
  • Project Value R 237 300 000
  • Client Name Ehlanzeni District Municipality

Additional Info

  • Province Matola Mozambique
  • Project Date 2010
  • Project Value R 10 000 000
  • Client Name Mashova Mozambique

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date 2011
  • Project Value R 35 000 000
  • Client Name Private Developer

Additional Info

  • Province Limpopo
  • City or Town Sekhukhune District Municipality
  • Project Date 2005 to 2008
  • Project Value R 102 500 000
  • Client Name RAL, Mr. J H Groenewald

Additional Info

  • Province Limpopo
  • Project Date 2007 to 2009
  • Project Value R 48 000 000
  • Client Name Capricorn District Municipality, Mr Kennedy Chihota

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date 2009 to 2010
  • Project Value R 7 000 000
  • Client Name Private Developer

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date Current
  • Project Value R 9 000 000
  • Client Name Private Developer

PROJECT DESCRIPTION

Endecon Ubuntu (Pty) Ltd was appointed by the Limpopo Department of Education for the Repair & Refurbishment of Storm Damaged Schools in the Mopani & Sekhukhune Districts of Limpopo.

Additional Info

  • Province Limpopo
  • Project Date 2009 to 2010
  • Project Value R 210 000 000
  • Client Name Department of Education, Mr. Tumisho Makofane

Additional Info

  • Province Limpopo
  • Project Date 2010 to 2012
  • Project Value R 100 000 000
  • Client Name Roads Agency Limpopo, Mr. Niel Swarts

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date In Process
  • Project Value R 85 000 000
  • Client Name Private Developer

Mbombela has long been plagued by imbalances in the distribution of the employed population and the location of job opportunities, resulting in very long-distance commutes by the lower income residents of the area.  The LUTS study aimed to address these imbalances and studied the implementation of possible major land-use interventions in order to improve the distribution/location of residences and job opportunities and consequently reduce the negative impacts on the transportation systems in the area.  ENDECON was responsible for developing the Strategic Transportation Macro Model with the PTV VISUM transportation planning software suite.  The model was ultimately the primary tool used for testing land use and transportation interventions for 2020 and 2030 scenarios.

Additional Info

  • Province Mpumalanga
  • City or Town Mbombela
  • Project Date 2009 to 2010
  • Project Value R 350 000.00
  • Client Name Laduma TAPP Urban Planners & Ehlanzeni District Municipality